Replacement of K-2, K-3, K-4 and K-5 compressors in the air supply unit

Pavlodar, Kazakhstan2023–2026Project

Client: Pavlodar Petrochemical Plant LLP

About the project

About the project

Phased replacement of four compressors supplying dry instrument and plant air

Key engineering solutions

  • Replacement of four existing compressors
  • Use of existing foundations and electrical cells
  • Integration with operating utility systems